Electrical renovation
Pre-1960 houses
Knob-and-tube wiring is replaced step by step, one room at a time, starting with the most heavily loaded circuits.
Master electricians · Saint-Lambert
Pre-1960 houses and apartment buildings: in Saint-Lambert, our master electricians handle the work and the authorization the City requires for electrical work.

In short
Older houses and apartment buildings: here is the work we do in Saint-Lambert.
Pre-1960 houses
Knob-and-tube wiring is replaced step by step, one room at a time, starting with the most heavily loaded circuits.
2,445 high-rise dwellings
In a building, we also replace the meter stack and the switchgear.
City authorization
A manual transfer switch and an outdoor inlet, or an automatic transfer switch for a standby unit; the gas side is handled by a licensed gas contractor. Never run it in the garage: place it at least 6 metres from buildings, as Health Canada recommends.
City authorization
We connect heat pumps; the load calculation first tells us whether the panel can take it.
Saint-Lambert is a city in Montérégie, within the Longueuil agglomeration, reconstituted on January 1, 2006. It has 23,472 residents according to the 2026 population decree. Not to be confused with Saint-Lambert-de-Lauzon, in Chaudière-Appalaches.
In the 2021 census: 22,761 residents and 10,550 occupied dwellings, 6,425 of them owner-occupied.
| Type | Dwellings (2021) |
|---|---|
| Building under five storeys | 3,665 |
| Single-detached house | 3,025 |
| Building of five storeys or more | 2,445 |
| Semi-detached house | 725 |
Saint-Lambert is served by Hydro-Québec; no municipal rebate there covers electrical work (search of November 13, 2026).
Saint-Lambert’s zoning bylaw 2024-215 is precise about equipment that involves electricity.
A generator goes in the rear yard only, at least 3 m from a lot line, and either inside an accessory building, surrounded by an acoustic screen, or in an enclosure designed to meet the City’s noise standards.
A heat pump is not allowed in the front yard and stays at least 2 m from a lot line; at most two units per dwelling, hidden from the street by a hedge or a screen.
Every new building is connected to the power grid underground, except an overhead connection to existing lines on the periphery, with no new pole in the street right-of-way or the front yard; electrical conduit fastened to a wall is allowed only when a technical constraint prevents running it inside.
A new multi-family building provides Level 2 charger installations for at least half of the required spaces, with at least 2 working chargers.
Call 438-542-7304, day or night.
What to do, if there is no danger: switch off the main breaker, then leave the room where the panel is.
Another South Shore city.
The Longueuil borough.
How to spot it and replace it.
Yes, according to the City’s permits page. We make the application with you.
The City also requires an authorization to install them.
Yes: among other things, we replace meter stacks and switchgear there.
No municipal rebate found on November 13, 2026; Québec’s Écorecharge rebate does exist.
Sources · Checked on November 13, 2026
Your contact details and three or four quick questions. Not sure of an answer? Leave “Not sure” and we will check on site.
Master electricians · Saint-Lambert
Tell us what needs doing: we come and see, we prepare the authorization, and you get a written price, free of charge.