Gas, base and unit: who handles what
A propane or natural gas standby involves several trades. The gas connection, if there is one, is the job of a gas contractor we coordinate with. We do all the electrical part: transfer switch, auxiliary panel, hookup.
The base the unit sits on is the business of the general contractor or the supplier, as the case may be. On propane, plan for a real tank: Generac, the brand we install most often, requires at least 250 US gallons for a residential generator, and cylinders aren’t enough.
The unit’s warranty comes from its manufacturer: 5 years or 2,000 hours for Generac’s standard warranty. Everything we install is certified for Canada.
As for the schedule, the on-site work for a standby is counted in days, and the wait comes mostly from the fuel connection. A tip: don’t wait until November to start. The quote comes with a written schedule.