RBQ licence: 5815-0137-01

Proud partners:CAA Habitation recommendedCMEQ master electrician

info@stmelectrique.ca(438) 542-7304

Home › Electrical panel › Châteauguay

Electrical panel replacement in Châteauguay

About five hours without power; the price is in the written quote, free of charge. We handle the Hydro-Québec and municipal steps.

Get a quote

Checked on September 18, 2026RBQ licence 5815-0137-01CMEQ memberBy the master electricians of STM-Électrique

In Châteauguay, replacing a 200 A electrical panel takes one day and leaves you without power for about 5 hours; the price is in the written quote, free of charge. No permit is required for a dwelling of 4 units or fewer. Only a master electrician who is a CMEQ member can do the work.

Jump to a section8
  1. Why now
  2. Which amperage
  3. Fuses or breakers
  4. How it goes
  5. The price
  6. The permit
  7. Who is allowed
  8. Frequently asked questions

Why are so many panels running out of steam in Châteauguay?

Châteauguay has 19,920 private dwellings. The 2021 census counts 7,405 built between 1961 and 1980 and 3,545 from 1960 or earlier: 10,950 dwellings, 55% of the city, were wired before 1981.

The city boomed in the 1960s and 1970s, when the Mercier Bridge put the South Shore twenty minutes from Montréal. These houses were given a 100 amp panel that was more than enough at the time. The old village still has 60 amp services and fuse boxes.

Today, the call almost always comes for the same reason: someone wants to add something, and there’s no room left.

Which amperage for which house?

PanelWhat it supportsThe sign it’s no longer enough
60 AA house built before 1960, oil or gas heating, no large appliancesNo free space left, and an insurer asking questions at renewal
100 AA house from the 1960s to 1990s still as it was builtA breaker that trips when two appliances start together, or no room for a charger
200 AToday’s standard: electric heating, heat pump, EV charger—
320 to 400 ALarge house, or charger + heat pump + spa + workshop—

Fuses, breakers, and the panels to watch

With housing this age, four situations come up again and again.

What you haveHow to recognize itWhat it means
Fuse boxRound screw-in fusesSeveral insurers refuse it or charge more. Common in homes built before 1960.
Full 100 A panelNo free space, stacked double breakersNothing is broken, but nothing more can be added. Upgrade to 200 A.
Federal Pioneer Stab-LokBrand written on the doorBreaker reliability disputed for decades. Have it looked at.
One panel per unitDuplex and triplex: each unit has its own, plus a service panelThe replacement is planned unit by unit, and the power cut is coordinated with the tenants.

How does it go, in practice?

One working day, including about five hours without power. That’s the real answer to the question everyone asks first.

We file the request with Hydro-Québec, which comes to disconnect the service. The old panel comes out, the new one goes in, every circuit is identified again one by one — that’s the longest part, and the one that will serve you for twenty years. Hydro-Québec reconnects, and the installation is tested before we leave.

In a house built before 1960, we also look at the mast and the meter base while we’re there: they’re often the same age as the panel.

What does it cost in Châteauguay?

The price depends on your installation, for example when the service entrance is redone at the same time: you get it in the written quote, free of charge. The real price depends on the target amperage, the condition of the service entrance and the mast, and the number of circuits to redo. A sub panel costs considerably less.

A photo of your open panel is often enough to tell you the next steps, without a visit.

Do you need a permit in Châteauguay?

The City of Châteauguay is one of the few to answer clearly, and its answer depends on the type of dwelling:

Type of dwellingPermit
4 units or fewer — maintenance, minor repair or replacement of a systemNo permit required
Multi-family dwelling of 4 units or more — replacement of a systemPermit required

Note: the City’s text puts “4 units” in both categories. If your building has exactly four, we check with the City before we start — and in every case, we handle the forms, for the municipality as well as for Hydro-Québec.

Who is allowed to replace a panel in Québec?

The question comes up all the time, and the answer surprises people: it isn’t a matter of skill, it’s a matter of law.

“No one may perform electrical work of any kind, in their residence or elsewhere for others, unless they are an electrical contractor.” (translated from French)

“A person who contravenes the Master Electricians Act and the Building Act is liable to a fine of $5,000 to $200,888.” (translated from French)

Corporation des maîtres électriciens du Québec

In other words: even at home, even if you know how. STM Électrique inc. is a CMEQ member and holds RBQ licence 5815-0137-01.

Frequently asked questions

Can I replace my panel myself?

No. The Master Electricians Act forbids it, even in your own home, and the fine ranges from $5,000 to $200,888.

Do I need to notify Hydro-Québec?

Yes, and the electrician does it. The service request and the declaration of work go through Hydro-Québec’s professional portal, which only master electricians can access.

How long will I be without power?

About five hours over one working day. The rest goes to the connection and the testing.

I have a fourplex. Do I need a permit?

That’s precisely the case where the City’s text is ambiguous. We call Châteauguay for you and come back to you with the answer before planning anything.

Can my insurer refuse a fuse box?

Several insurers set conditions or refuse to cover a house still supplied by a fuse box. That’s often what prompts the call.

What we install. To replace a panel, we most often install a Siemens, a brand Adam Chirola considers reliable and high quality. Its breakers are easy to find across Québec: the day you need to add one for an EV charger, or replace one in ten years, it takes one visit, not a special order.

Unsure about your panel in Châteauguay? Send us a photo and we’ll reply with the next steps.

Get a quoteor call 438 542-7304

Get a quote: electrical panel

EN - Service request (English service pages)
Sources — Corporation des maîtres électriciens du Québec, Warning: licence required (in French). Hydro-Québec, standard E.21-10, Low-voltage electricity service (in French). Statistics Canada, Census Profile, 2021. Régie du bâtiment du Québec, Construction Code, Chapter V — Electricity and technical interpretations. Municipal bylaws of the city concerned. Page checked on September 18, 2026.