Electrical panel upgrade in Québec: cost and how the day goes
How long you’ll be without power, who calls Hydro-Québec, what happens hour by hour, and what changes the price.
In short
- The power is off for half a day to a full day in the vast majority of cases.
- The contractor coordinates with Hydro-Québec, not you. You don’t have a single call to make.
- A municipal permit is required, and the electrician takes care of it.
- The load calculation is done beforehand, not during the work. It decides what capacity to install.
- At STM-Électrique, an electrical panel replacement costs around $1,850, and $2,900 if the service entrance is redone at the same time.
In this guide
Most people who call us about a panel don’t ask about the price first. They ask: “How long am I going to be without power?”
This guide answers that, and everything that comes with it: who does what, in what order, and what can throw off the schedule.
Before: the calculation, the permit, Hydro-Québec
What happens before the day of the work decides whether that day goes well.
The load calculation
It comes first, and it’s not a formality. The calculation adds up your living area, how you heat, your fixed appliances and anything you plan to add, like an EV charger, a heat pump or a spa. It decides what capacity to install.
There are three possible outcomes: your current panel is enough and you may not need to change it, it’s enough with load management, or you need more capacity.
The municipal permit
Replacing a panel generally requires a municipal permit. The electrical contractor applies for it, and also declares the work to the Régie du bâtiment du Québec (RBQ). The cost and the wait vary from one city to the next on the North Shore, and that’s one of the things that can push a date back.
Coordinating with Hydro-Québec
To change a panel, the power has to be cut upstream. Depending on the work, that means Hydro-Québec disconnects the service and then reconnects it. We place that request and we follow up on it. You don’t have to call, book an appointment or juggle the calendar.
It’s also the one part nobody fully controls. A delay at Hydro-Québec pushes the date back, and it’s the number one reason a panel job doesn’t happen the week it was requested.
The day of the work, step by step
Here’s what a typical day looks like at your place.
| Step | Who handles it | What you need to do |
|---|---|---|
| Arrival and protecting the work area | The crew | Clear access to the panel |
| Shutting off the power | Hydro-Québec or the electrician | Nothing |
| Removing the old panel | The crew | Nothing |
| Installing the new panel | The crew | Nothing |
| Connecting the circuits one by one | The crew | Nothing |
| Identifying each circuit | The crew | Confirm what powers what |
| Powering back up and final checks | The crew | Check your appliances with us |
The longest part isn’t the one you’d expect. It’s not removing the old panel or installing the new one: it’s connecting and, above all, identifying the circuits. In an older house, the original labels almost never match reality, because thirty years of renovations have been through there. We trace each circuit before labelling it, because a poorly labelled panel costs time on every future service call.
How long you’ll be without power
The honest answer: half a day to a full day for the vast majority of residential panel replacements. We give you the exact window before the work, not that morning.
What makes the outage longer:
- The service entrance redone at the same time (mast, meter base, supply cable)
- A large number of circuits to trace and connect
- Non-compliant wiring found when we open things up, which has to be fixed before reconnecting
- Waiting for Hydro-Québec to reconnect the service
What we suggest you plan for: run down what’s in your freezer in the days before, keep a cooler for whatever has to make it through, and if you work from home, plan to work somewhere else that day. If you have medical equipment that plugs in, tell us when you ask for your quote: it changes how we organize the day.

Electrical panel upgrade cost, and what changes it
Here’s the electrical panel upgrade cost at STM-Électrique for a single-family house, from a simple replacement to a 100 amp to 200 amp upgrade:
| Work | Ballpark | When it’s the right choice |
|---|---|---|
| Panel replacement only, 200 A | around $1,850 | The service entrance is in good shape and the capacity is enough |
| Panel replacement, 100 A | around $1,500 | Small house, non-electric heating |
| 100 A to 200 A upgrade with the service entrance | around $2,900 | The most common case in a house built before 1990 |
These are ballpark figures for a typical house, not firm prices. Nobody can give you an exact price without seeing the place, and here’s why:
- The distance between the panel and the meter. Three metres or fifteen metres isn’t the same cable or the same amount of time.
- The condition of the service entrance, the mast and the meter base. If they need redoing, that’s a second job added on top of the first.
- The number of circuits. Twenty circuits or forty shows up over the course of the day.
- Access to the panel. A panel in a finished basement, behind a closet or in a cluttered space needs work before we can even start.
- The municipal permit, whose cost varies by city.
- Bad surprises. Non-compliant wiring behind the old panel does happen, and it has to be fixed.
How we work: we look, we put a price on it, and that price is written in the quote before anything starts. If we find something along the way, we call you before going any further.
Not sure about your setup?
We look, we put a price on it, and the price is in writing before anything starts.
Send my quote requestAfter: labelling, inspection, paperwork
Three things close out the job, and each one matters.
Labelling. Each breaker is labelled by what it actually powers, not by what the old label said. That’s what lets you shut off the right circuit five years from now without guessing.
Inspection. The work is declared and goes through the inspection required by regulations. That’s the other side of the permit.
Paperwork. You receive the details of what was done. Keep them: that’s what your insurer, your future buyer or their inspector will ask for. Work that’s well done but not documented won’t solve your insurance problem.
Frequently asked questions
How long will I be without power?
Half a day to a full day in most cases. You get the exact window before the work, not that morning.
Do I need to be home during the work?
At least at the start and at the end. At the start for access, and at the end to confirm with us what powers what and to check your appliances. In between, you can go about your day.
What about my freezer?
A full freezer holds for several hours if it stays closed. Run down what’s in it a few days ahead and have a cooler ready for the essentials. If you have medical equipment that plugs in, tell us when you ask for your quote.
Does the whole house need to be rewired?
Almost never. Changing the panel means changing the distribution point, not the circuits that run from it. We fix anything non-compliant when we connect, but a full rewire is a whole other job, and it’s rarely needed.
Who applies for the permit?
We do. If your city requires a permit, we apply for it, and we declare the work to the Régie du bâtiment du Québec. You have nothing to do with your municipality.
Can I change my panel myself?
No. Electrical work on a service connection requires an RBQ licence, subclass 16.0. Beyond the law, even with the main breaker off, the incoming cables and the breaker’s line terminals are still live.
Should the service entrance be replaced at the same time?
Not always. In a house built before 1990, both often reach the end of their life together, and it becomes cheaper to do everything at once. In a newer house, the panel alone is often enough. The inspection decides.
Need a new panel?
We do the load calculation, we handle the permit and Hydro-Québec, and you know the price before anything starts.