Home › Electrical panel › Longueuil
Electrical panel replacement in Longueuil
About five hours without power; the price is in the written quote, free of charge. We handle the Hydro-Québec and municipal steps.
In Longueuil, replacing a 200 A electrical panel takes one day and leaves you without power for about 5 hours; the price is in the written quote, free of charge. Only a master electrician who is a CMEQ member can do the work: the law forbids the owner from doing it, even at home.
Jump to a section9
Why are so many panels running out of steam in Longueuil?
Longueuil has 113,085 private dwellings. According to the 2021 census, 44,100 were built between 1961 and 1980 and 18,450 date from 1960 or earlier. That makes 62,550 dwellings — 55% of the city — built before 1981.
It’s the most varied housing on the South Shore. In Vieux-Longueuil, we still come across fuse boxes. In the neighbourhoods from the 1960s and 1970s, it’s full 100 amp panels. And everywhere, plexes: duplexes, triplexes, each unit with its own panel, plus a service panel.
That variety changes the way we work. A replacement in a Saint-Hubert bungalow and a replacement in a Vieux-Longueuil triplex don’t follow the same steps or need the same coordination.
Vieux-Longueuil, Saint-Hubert and Greenfield Park
Longueuil has three boroughs: Vieux-Longueuil, Saint-Hubert and Greenfield Park. Saint-Hubert has its own page: electrical panel replacement in Saint-Hubert.
On the South Shore, we also come across a lot of aluminum wiring. How to recognize it and what to do: see the guide on aluminum wiring.
Which amperage for which house?
| Panel | What it supports | The sign it’s no longer enough |
|---|---|---|
| 60 A | A house built before 1960, oil or gas heating, no large appliances | No free space left, and an insurer asking questions at renewal |
| 100 A | A house from the 1960s to 1990s still as it was built | A breaker that trips when two appliances start together, or no room for a charger |
| 200 A | Today’s standard: electric heating, heat pump, EV charger | — |
| 320 to 400 A | Large house, or charger + heat pump + spa + workshop | — |
Adding an EV charger? See EV charger installation in Longueuil.
Fuses, breakers, and the panels to watch
With housing this mixed, four cases come up more than the others.
| What you have | How to recognize it | What it means |
|---|---|---|
| Fuse box | Round screw-in fuses | Several insurers refuse it or charge more. Common in homes built before 1960. |
| Full 100 A panel | No free space, stacked double breakers | Nothing is broken, but nothing more can be added. Upgrade to 200 A. |
| Federal Pioneer Stab-Lok | Brand written on the door | Breaker reliability disputed for decades. Have it looked at. |
| One panel per unit | Plex, duplex, triplex: each unit has its own, plus a service panel | The replacement is planned unit by unit, and the power cut is coordinated with the tenants. |
How does it go, in practice?
One working day, including about five hours without power. That’s the real answer to the question everyone asks first.
We file the request with Hydro-Québec, which comes to disconnect the service. The old panel comes out, the new one goes in, every circuit is identified again one by one. Hydro-Québec reconnects, and the installation is tested before we leave.
In a plex, the power cut is planned in advance with the tenants affected, and we group the work when several panels need replacing. That avoids cutting the power three times in the same building.
What does it cost in Longueuil?
The price depends on your installation, for example when the service entrance is redone at the same time: you get it in the written quote, free of charge. The real price depends on the target amperage, the condition of the service entrance and the mast, and the number of circuits to redo. A sub panel costs considerably less.
For an apartment building, the price comes after a visit: the number of panels and the way the service entrance is set up change everything.
Do you need a permit in Longueuil?
The City of Longueuil removes electrical work from the list of repairs exempt from a permit. In other words, a permit may be required, and the City itself specifies that its list doesn’t replace the text of the bylaw.
We won’t leave you guessing: we check with the City before we start, and we handle the forms, for the municipality as well as for Hydro-Québec. You have nothing to fill out.
Who is allowed to replace a panel in Québec?
The question comes up all the time, and the answer surprises people: it isn’t a matter of skill, it’s a matter of law.
“No one may perform electrical work of any kind, in their residence or elsewhere for others, unless they are an electrical contractor.” (translated from French)
“A person who contravenes the Master Electricians Act and the Building Act is liable to a fine of $5,000 to $200,888.” (translated from French)
Corporation des maîtres électriciens du Québec
In other words: even at home, even if you know how. STM Électrique inc. is a CMEQ member and holds RBQ licence 5815-0137-01.
Frequently asked questions
Can I replace my panel myself?
No. The Master Electricians Act forbids it, even in your own home, and the fine ranges from $5,000 to $200,888.
Do I need to notify Hydro-Québec?
Yes, and the electrician does it. The service request and the declaration of work go through Hydro-Québec’s professional portal, which only master electricians can access.
How long will I be without power?
About five hours over one working day. The rest goes to the connection and the testing.
I have a duplex. Do I have to replace everything at the same time?
No, but it’s often more economical. If the main service entrance has to be redone, it makes sense to use the disconnection to deal with the panels of the units concerned all at once.
What about Saint-Hubert or Greenfield Park?
They are boroughs of Longueuil: same municipal rules, same process. We work there the same way.
How much does a panel replacement cost in Longueuil?
The price depends on your installation, for example when the service entrance is redone at the same time: you get it in the written quote, free of charge. For the permit, we check with the City of Longueuil before we start.
What we install. To replace a panel, we most often install a Siemens, a brand Adam Chirola considers reliable and high quality. Its breakers are easy to find across Québec: the day you need to add one for an EV charger, or replace one in ten years, it takes one visit, not a special order.
Unsure about your panel in Longueuil? Send us a photo and we’ll reply with the next steps.
Get a quoteor call 438 542-7304To go further
- Replacing a panel: cost and how the day goes
- High-risk panels
- Six signs the service entrance needs replacing
- Service entrance replacement on the South Shore
Panel replacement elsewhere
- Beloeil
- Sainte-Julie
- Terrebonne
- Laval
- Brossard
- Châteauguay
- Saint-Hubert
- Dollard-des-Ormeaux
- Montréal
- South Shore
- Gatineau
Understanding your panel
CAA Habitation recommended