Service entrance replacement in Montréal
Service entrance and panel redone together on a single-family home: about six hours without electricity; the price is in the quote. The permit, when one is needed, and the calls to Hydro-Québec are on us.
In Montréal, redoing the service entrance with a 200 A panel leaves the house without electricity for about six hours; the price is in the written quote, free of charge. Allow about two weeks before the work, as a rule, Hydro-Québec steps included: we handle them.
Jump to a section9
How much does a service entrance cost in Montréal?
At STM-Électrique, the price of the service entrance and a 200 A panel redone together on a single-family home is in the written quote, free of charge. You get the quote after the visit.
Going to 320 amps costs well more: it’s a job of another scale.
An underground service is priced separately, excluding excavation and the private pole; Hydro-Québec’s fees are added and billed directly by Hydro-Québec. All about underground: underground electrical service.
Mast, meter base, cable: what we redo
What we call the service entrance is the whole outdoor part: the bracket at the top of the mast, the mast itself, the meter base the meter plugs into, then the cable to the service box. The panel takes over inside.
The line with Hydro-Québec is called the connection point. The meter belongs to Hydro-Québec; the mast and the meter base belong to you, and replacing them is done at your expense, by your master electrician.
The service entrance and the panel are very often redone together, and it costs less that way: one disconnection, one job. For the panel alone, see our electrical panel replacement in Montréal page.
The details, part by part: mast, meter base, meter: who pays for what and service entrance.
The signs a service entrance needs redoing
A service entrance doesn’t fail all at once: it deteriorates outdoors, over years, and several signs can be seen from the sidewalk.
- A mast that is no longer plumb: it’s the most reliable sign, and every storm makes the lean worse.
- Rust that runs, swells the metal or goes through the meter base: water is getting in where the live connections are.
- A cracked or frayed cable jacket, loose fasteners, a branch rubbing on the cable.
- A 60 or 100 amp service on a house getting an EV charger or a heat pump: a capacity problem, not a wear problem.
A torn-off cable or a fallen mast is an immediate danger: call Hydro-Québec right away and don’t go near anything. The rest can be planned, and the guide replacing your service entrance: the 6 signs tells you what to do and when.
Older housing: plexes, meters and original service entrances
The 2021 census counts 816,338 occupied dwellings in Montréal. About 66% were built before 1981; 13.2% are apartments in a duplex, and 56.9% are in a building of fewer than five storeys.
In a building of that age, it’s common for the service entrance and the panel to be worn out at the same time.
When several meters are grouped on the same building, it’s a meter stack, and that’s what we redo, as our guide on meter stack replacement explains. For a meter stack, Adam Chirola, our master electrician, expects about six hours without electricity, as for a service entrance.
The permit in Montréal
Montréal has stopped issuing permits for electrical, plumbing and heating work, and refers to provincial regulations; the message appears in 18 of its 19 boroughs. In Saint-Léonard, the Info-permis sheet says it in one line: no permit for strictly electrical work.
What doesn’t change, permit or not: an electrical contractor to do the work, even in your own home, and a declaration of work sent to Hydro-Québec by a master electrician once the installation is ready to be connected.
The permit, when one is needed, is part of our job.
Westmount: Hydro Westmount’s grid
Here, the grid isn’t Hydro-Québec’s: Hydro Westmount, the city’s distributor, maintains it for every home and business. It also appears on the list of municipal networks published by Hydro-Québec.
Our electrician in Westmount page covers our work in that city.
Disconnecting, reconnecting: Hydro-Québec
Every new service entrance involves two operations on the grid: cutting the house’s supply, then restoring it. The forms and the coordination of those two moments are our job.
When the service stays at 200 amps or less, the master electrician can disconnect and reconnect it, with Hydro-Québec’s prior authorization. Above 200 amps, the work falls to Hydro-Québec, and the job follows its calendar.
Between your go-ahead and the job, plan on two weeks as a rule.
The day of the work: about six hours without electricity
Plan for about six hours without power.
In order: we disconnect the power, take down the old installation, install the new mast, meter base and cable, connect your circuits, restore the power, then check and label the panel. The documents then go to Hydro-Québec, and you receive the details of the work.
A house or cottage left disconnected for more than twelve months? Hydro-Québec will only reconnect the installation once it’s brought up to the current standard.
Frequently asked questions
How much does a service entrance replacement cost in Montréal?
Often redone with a 200 A panel on a single-family home; price in the STM-Électrique quote. A 320 A service costs well more, and an underground service is priced separately, excluding excavation and the pole. The exact price is in the quote, free of charge.
Do you need a permit to redo a service entrance in Montréal?
Montréal has stopped issuing permits for electrical work inside a building and refers to provincial regulations. The work remains reserved for an electrical contractor, and the declaration of work is sent to Hydro-Québec by a master electrician. The permit, when one is needed, is part of our job.
My plex has several meters: what gets redone?
If the meters are grouped in a stack, it’s the meter stack that gets redone, a different job from a house service entrance. Adam Chirola, our master electrician, expects about six hours without electricity for a meter stack. Our guide on meter stack replacement explains the steps.
How long should I plan before the work?
Usually two weeks before the work, Hydro-Québec steps included, and we handle them. We also arrange the disconnection and the reconnection, and the date is confirmed to you as soon as it’s set: no calls on your side.
A leaning mast or a rusted meter base on your house or plex? Send a photo of the mast and the meter base: we’ll tell you what’s urgent, what can wait, and what it costs.
Get a quoteor call 438 542-7304To go further