Electrical work without a permit, according to the City
The City of Westmount states in black and white which electrical work can be done without a building permit. According to its construction and renovation FAQ, in accordance with the by-law on permits and certificates, the following electrical work does not require a building permit beforehand:
- replacing the electrical service box serving only one residential unit;
- adding or removing electrical outlets;
- adding or removing electrical switches;
- adding or removing light fixtures.
The City specifies that this exemption in no way removes the obligation to comply with all applicable regulations, nor the obligation to check with the competent authority in case of doubt. And no permit doesn’t mean do-it-yourself work: in Québec, electrical work of any kind is reserved for electrical contractors.
A larger interior renovation, on the other hand, requires a permit issued by the Permits and Inspections Division of the Urban Planning Department, at 514-989-5219. The same goes for mechanical equipment: a heat pump, a spa or an air conditioner. For a generator, the City asks for a start-up sheet, and for any mechanical unit a technical data sheet with its dimensions and its noise level in decibels. By-laws 1303 on zoning and 1387 on noise apply, and, generally, a project affecting the exterior goes through By-law 1305 on Site Planning and Architectural Integration Programmes (SPAIP), with approval from City Council.
When our part requires a permit or a declaration of work, we take care of it for you. A generator is never installed in a garage, and Health Canada recommends placing it at least 6 metres from buildings.