Businesses and industry
Technoparc, industrial parks
Service entrance and electrical distribution, generator, EV chargers for the parking lot: we take on commercial and industrial projects.
Master electricians · Saint-Laurent
The region’s second-largest employment hub after downtown, the borough of Saint-Laurent also has 39,155 households. Apartment building, house, business or plant: our master electricians work there by appointment, with a written price.

In short
A borough with two faces: residential neighbourhoods, and a territory 70% devoted to industrial and commercial activities. We work in both.
Technoparc, industrial parks
Service entrance and electrical distribution, generator, EV chargers for the parking lot: we take on commercial and industrial projects.
Chargers required by zoning
The load calculation sets what the building’s service entrance can give the chargers.
Panel, charger, heat pump
A panel to replace, a FLO Home X3 charger in the garage, a heat pump to hook up: we start by checking the capacity of the service entrance.
Parking lot being redone
A commercial or industrial parking lot that is built or redone must have chargers: we do their power supply.
A general electrical project? Your contact details and a few questions are all it takes.
Get a quoteZoning by-law RCA08-08-0001, in its April 29, 2026 consolidation, requires chargers of Level 2 or higher in several parking lots. Read on November 16, 2026.
| Parking lot | Chargers required |
|---|---|
| Multi-family housing | At least 10% of the spaces provided |
| Visitor spaces | At least 25% of the spaces, with a shared charger |
| Retail, service or industry, under 100 spaces | 10% of the spaces, when the lot is built or redone |
| Retail, service or industry, 100 spaces or more | 10% of the first 100 spaces, 5% of the rest |
The by-law also states that installing a charger is not a reason to cut down a tree.
No borough program related to electricity is open as of November 16, 2026: its green equipment program has ended. For a charger, there is still Écorecharge, the Québec program.
Saint-Laurent has been a Montréal borough since January 1, 2002; its territory, that of the former city of Saint-Laurent, sits at the geographic centre of the island.
The 2021 census counts 102,104 residents on 42.8 km², and 39,155 households, 52.2% of them tenants. Apartments make up 74.5% of occupied dwellings; single-family homes, 25.3%, and up to 40.7% in the Dutrisac neighbourhood.
Major repairs are needed in 3,130 dwellings, their occupants say; the category covers defective electrical wiring, among other things.
The neighbourhoods are not the same age. Norvick is 248 single-detached houses whose construction began in 1942 to house war-effort workers. Cosmos is a 1949 project. Bois-Franc was inaugurated in 1993 on the former Cartierville airport site.
On the economic side, the City counts 4,500 businesses and some 108,000 workers. The Technoparc, created in 1987, brings together more than 100 companies at the junction of highways 40 and 13.
The City of Montréal treats the heat pump, the air conditioner, the generator and solar panels as mechanical equipment.
For an exclusively residential building, a permanent heat pump or air conditioner needs no permit. A permit is required when the equipment is outside a commercial, industrial or institutional building.
For a house, a duplex or a multiplex, the zoning by-law sets minimum distances from property and street lines: they are confirmed at the permit counter. On the ground at the side, opaque landscaping must hide the unit from the street. No mechanical equipment may be visible on a facade.
For an industrial lot, the zoning by-law has a rule specific to the generator, on its location and on the screen that hides it.
Every hot tub requires a permit, even under 2,000 litres: in the back yard, at least 1 m from the property lines, and never under an electrical wire.
Do you keep a portable generator for outages? Never run it in the garage: place it at least 6 metres from buildings, as Health Canada recommends.
Montréal has dropped the municipal permit for electrical work: only Québec’s regulations govern it. Walls being affected or rooms being redivided do bring back the need for a permit.
The borough’s permit counter is at 777 Boulevard Marcel-Laurin.
Hydro-Québec distributes electricity in Saint-Laurent; on the island, only Westmount has its own municipal network. When a service entrance is replaced, the disconnection request to Hydro-Québec comes from us, and you are given the time in advance.
Electrical emergency, at any hour of the day or night: 438-542-7304.
Our services for businesses.
The neighbouring town, to the south.
All the boroughs.
Yes, by appointment, for houses, apartment buildings, businesses and industries.
The price depends on your installation: you get it in the written quote, free of charge.
The zoning by-law requires a charger of Level 2 or higher for at least 10% of the spaces provided for a multi-family building, and for 25% of visitor spaces.
Not for an exclusively residential building; yes if the equipment is outside a commercial, industrial or institutional building.
Sources · Checked on November 16, 2026
Your contact details and three or four quick questions. Not sure of an answer? Leave “Not sure” and we will check on site.
Master electricians · Saint-Laurent
Apartment building, house, business or plant: tell us about the project, we come to see it, and the price is given to you in writing, free of charge.
24/7 emergency24/7 emergency electrician438 542-7304
We also serve, in the Montréal area