Original wiring
Knob and tube
No need to empty the house: it is redone one room after another, starting with the most-used circuits.
Master electricians · Town of Mount Royal
Nearly two-thirds of Town of Mount Royal’s dwellings date from 1960 or earlier: our master electricians redo wiring, panels and service entrances there, by appointment, written price first.

In short
In a housing stock this old, here is what we do, from the original installation to the EV charger.
Knob and tube
No need to empty the house: it is redone one room after another, starting with the most-used circuits.
To a breaker panel
The replacement is planned with the load calculation, which sets the amperage needed.
Planned power outage
We request the outage from Hydro-Québec; you are given the time in advance.
FLO Home X3
The charger we install most often; in an older house, we first check the capacity of the service entrance.
A general electrical project? Your contact details and a few questions are all it takes.
Get a quoteTown of Mount Royal (Ville de Mont-Royal in French) is a town reconstituted on January 1, 2006, within the Montréal agglomeration. Not to be confused with Le Plateau-Mont-Royal, a Montréal borough.
Population: 22,809 residents according to the 2026 decree; 20,953 in the 2021 census.
| Dwellings (2021) | Number |
|---|---|
| Single-detached houses | 2,500 |
| Apartments, buildings under five storeys | 2,090 |
| Semi-detached houses | 1,355 |
| Buildings of five storeys or more | 1,065 |
Owners occupy 5,030 dwellings, tenants 2,700.
Indoors, the Town requires a permit when the work touches structural elements or changes the number of dwellings; electrical work is not mentioned. If your project needs one, we prepare it.
Construction noise is prohibited before 7 a.m. and after 8 p.m. on weekdays, before 9 a.m. and after 5 p.m. on Saturdays, and all day on Sundays and holidays.
No residential rebate from the Town covers electrical work; its energy page refers to Rénoclimat, a Québec program.
In Town of Mount Royal, zoning bylaw 1441 sets close rules for mechanical equipment.
A heat pump or a generator cannot be installed without plans and a permit; only a window air conditioner of 12,000 BTU/h or less is exempt. Noise from mechanical equipment is limited to 48 dBA from 10 p.m. to 7 a.m. and 52 dBA from 7 a.m. to 10 p.m., measured on the inside of the lot line.
For a single-family or two-family house (uses H-1 and H-2), a standby generator goes in the rear yard, at least 3 m from any lot line, or in the side or secondary front yard, at least 2 m from the side line. It is enclosed behind an acoustic screen, stays at or below 60 dBA, and its start-up test runs on weekdays, between 9 a.m. and 5 p.m.
A portable generator is stored inside a building after use; while it runs, it stays outdoors: never run it in the garage, place it at least 6 metres from buildings, as Health Canada recommends. Above-ground and semi-inground pools are prohibited, as are above-ground spas of more than 2,000 litres.
In a multi-family building (use H-3), the bylaw requires at least one electrified parking space per unit.
A power failure or a burning smell: 438-542-7304, 24 hours a day.
If it is safe to do so, switch off the main breaker; otherwise, simply move away.
Another city in the Montréal agglomeration.
Montréal’s boroughs.
How to spot it and replace it.
Yes; we come by appointment, for homes and businesses alike.
According to the Town, noisy outdoor work can be done from 7 a.m. to 8 p.m. on weekdays and from 9 a.m. to 5 p.m. on Saturdays; never on Sundays or holidays.
Possibly. The visit will tell; if some remains, it is replaced in stages.
Sources · Checked on November 13, 2026
Your contact details and three or four quick questions. Not sure of an answer? Leave “Not sure” and we will check on site.
Master electricians · Town of Mount Royal
An older house to bring up to date? Write to us: a visit, then a free, detailed quote.
24/7 emergency24/7 emergency electrician438 542-7304
We also serve, in the Montréal area