A general electrical project? Your contact details and a few questions are all it takes.
Get a quoteA suburb built mostly before 1981
Beaconsfield came into being on June 30, 1910, when it separated from the parish of Saint-Joachim-de-la-Pointe-Claire. It grew slowly, to 990 residents in 1951, before quickly turning into a residential suburb during the 1950s and 1960s. Beaurepaire Village, the commercial area at the heart of the city, began to develop in 1925. Merged into Montréal in 2002, the city was reconstituted in 2006 and remains part of the Montréal agglomeration.
In 2021, Statistics Canada counted 19,277 residents and 6,755 occupied dwellings: 5,795 single-detached houses (about 85.8%), 520 row houses and 340 dwellings in buildings of four storeys or fewer. About 89.6% of households own their home. Here is the breakdown by construction period.
| Built | Number of dwellings | What it means for the electrical system |
|---|
| In 1960 or earlier | 2,035 (about 30.1%) | If a fuse panel is still in place, it can be replaced with a breaker panel; a corroded or loose mast is replaced along with the service entrance. |
| From 1961 to 1980 | 3,310 (about 49.0%) | Aluminum wiring is concentrated in houses from 1965 to 1975: we check its connections, then redo them with suitable hardware. |
| From 1981 to 1990 | 655 (about 9.7%) | The panel’s capacity for a new appliance: a subpanel or an upgrade to 200 A, based on the calculation. |
| From 1991 to 2021 | 750 (about 11.1%) | Even when the installation is recent, it goes through a load calculation before an EV charger or a spa is added. |
The load calculation for a house that receives an EV charger must include that charger. Depending on the result, we connect it with no other change, pair it with a load controller or increase the capacity first.